Viability Research for Structure
1. The number of inhabitants of the structure:
commercial or residentialIt is a Commercial structure.
2. The ages and gender of inhabitants
All ages can participate, 16 to 21 and up working (male and female accepted)
3. Future plans to add onto the structure:
future expansionExpansion can be decided depending upon popularity of building.
4. A list of activities to be done with the structure (i.e., office use, office and living use, or storage only)
Mostly living use and some in the office.
5. Entertainment habits
Mainly a sitdown restaruant for people to enjoy and also a lounge area outside.
6. Desired number of rooms, minimum sizes, and types of rooms
4 Restrooms, kitchen, 2 sit down areas, storage room, HVAC room.
7. Kitchen with types of appliances
desiredOvens, stoves, fridges, tables, all appliances, ect.
8. Bathrooms with the number, size, and types of fixtures desired.
4 bathrooms, 2 employee and 2 public restrooms. Size depends on amount of people.
9. Planned length of use of structure
999,999 years
10. ADA requirements
In parking lot, and in bathrooms.
11. Budget for structure
$999,999,999
12. Style of structure
Comercial, cubed
13. Special needs, i.e.:
Handicap accessHandicap Restroom, Parking Spaces, and Entrances to rooms
Wednesday, April 28, 2010
Tuesday, April 27, 2010
Activity 4.7.1 – Landscaping
Procedure
1. list the seven fundamental Xeriscape areas that must be considered when designing a landscape.
Planning and design
Soil analysis
Practical turf areas
Appropriate plant selection
Efficient irrigation
Use of mulches
Appropriate maintenance
2. Describe/define what the term “Xeriscape” means.
Xeriscaping and xerogardening refers to landscaping and gardening in ways that reduce or eliminate the need for supplemental irrigation.
3. What part does shade play in water resource management and human comfort?
water resource- forest improve our air, protect our water, save energy, and improve economic sustainability.
human comfort- it give shade on hot days in the summer, gives you a sence of privacy
4. How can it be incorporated into landscape design efficiently?
pick a tree that is easy to maintain, make sure that it fits the aree that you are look at
5. When is it appropriate to provide shade and when is it not appropriate?
its only appropriate to plant tree's, is whaen you dont have any. if you plant to many the property will become over grown.
6. list the criteria that should be followed when selecting plant material for a site.
Select trees, shrubs and groundcovers based on their adaptability to your region's soil and climate.
Procedure
1. list the seven fundamental Xeriscape areas that must be considered when designing a landscape.
Planning and design
Soil analysis
Practical turf areas
Appropriate plant selection
Efficient irrigation
Use of mulches
Appropriate maintenance
2. Describe/define what the term “Xeriscape” means.
Xeriscaping and xerogardening refers to landscaping and gardening in ways that reduce or eliminate the need for supplemental irrigation.
3. What part does shade play in water resource management and human comfort?
water resource- forest improve our air, protect our water, save energy, and improve economic sustainability.
human comfort- it give shade on hot days in the summer, gives you a sence of privacy
4. How can it be incorporated into landscape design efficiently?
pick a tree that is easy to maintain, make sure that it fits the aree that you are look at
5. When is it appropriate to provide shade and when is it not appropriate?
its only appropriate to plant tree's, is whaen you dont have any. if you plant to many the property will become over grown.
6. list the criteria that should be followed when selecting plant material for a site.
Select trees, shrubs and groundcovers based on their adaptability to your region's soil and climate.
Friday, April 23, 2010
Civil EngineeringJacob Herrell & Jessica BrownSewage
UtilitySourcescombined sewer overflowsDistribution MethodsSerial distribution: use a step-down to restrict flow out of each trench in the seriesDistribution box (d-box): divide the flow between lateral trenches.SizeMinimum of 8-inch diameter linesMinimum easement width for water/sanitary sewer mains: 5ft on each side of the pipeSchematic Symbols· P = Sewage main hole (soil & waste)· STP = Sewage treatment plantQuestions:1. How do you determine how large a utility supply must be in order to support the demands of service?By the amount of people that are connected to the line. Or the amount of people in the area.2. Explain why you chose above or below ground installations for your utilities.Underground- it doesn’t take up the room on the surface, but it is hard to get to when there is a break because its under ground. Above ground-easier to take care of but, takes up land that could be used.3. Why do so many different utilities use many of the same terms?It makes it easier to communicate with others when different places use the same terms.
UtilitySourcescombined sewer overflowsDistribution MethodsSerial distribution: use a step-down to restrict flow out of each trench in the seriesDistribution box (d-box): divide the flow between lateral trenches.SizeMinimum of 8-inch diameter linesMinimum easement width for water/sanitary sewer mains: 5ft on each side of the pipeSchematic Symbols· P = Sewage main hole (soil & waste)· STP = Sewage treatment plantQuestions:1. How do you determine how large a utility supply must be in order to support the demands of service?By the amount of people that are connected to the line. Or the amount of people in the area.2. Explain why you chose above or below ground installations for your utilities.Underground- it doesn’t take up the room on the surface, but it is hard to get to when there is a break because its under ground. Above ground-easier to take care of but, takes up land that could be used.3. Why do so many different utilities use many of the same terms?It makes it easier to communicate with others when different places use the same terms.
Tuesday, April 20, 2010
Questions 4.6.2
1. Determine the following information about the PLTW firehouse plan:
· What is the diameter of the existing water main? 6"
· What is the diameter of the proposed water service? 8"
· What is the elevation of the top of the hydrant? 301.79 ft
· What diameter pipe is used for the building’s sanitary sewer line? 6"
· Where is the gas meter to be located? south end, middle of outside wall
· What is the spot elevation in the front left-hand corner of the building? 300.0 ft
2. Why do you think red is the color used to depict electricity? cause its a hot wire, electricity is running thought it, its dangerous and it could be a warning
1. Determine the following information about the PLTW firehouse plan:
· What is the diameter of the existing water main? 6"
· What is the diameter of the proposed water service? 8"
· What is the elevation of the top of the hydrant? 301.79 ft
· What diameter pipe is used for the building’s sanitary sewer line? 6"
· Where is the gas meter to be located? south end, middle of outside wall
· What is the spot elevation in the front left-hand corner of the building? 300.0 ft
2. Why do you think red is the color used to depict electricity? cause its a hot wire, electricity is running thought it, its dangerous and it could be a warning
Wednesday, April 14, 2010
Questions 4.4
1) In what ways do engineers use design to control traffic differently on an arterial opposed to a feeder street?
Direct traffic.
2)What are some of the factors you would have to consider if you were asked to design a new parking lot for your local library?
Slopes, ways people would enter and exit, ect.
3)How would the design of ingress or egress change if a building were to be used as a day care center instead of a senior center?
More exits.
1) In what ways do engineers use design to control traffic differently on an arterial opposed to a feeder street?
Direct traffic.
2)What are some of the factors you would have to consider if you were asked to design a new parking lot for your local library?
Slopes, ways people would enter and exit, ect.
3)How would the design of ingress or egress change if a building were to be used as a day care center instead of a senior center?
More exits.
Vocab 4.4
1.Arterial- Being a main road or channel with many branches
2.Bench Mark- A standard by which something can be measured or judged
3.Collectors- One that collects
4.Curb Cut- A small ramp built into the curb of a sidewalk to ease passage to the street, especially for bicyclists, pedestrians with baby carriages, and physically disabled people
5.Cut and Fill- process of constructing a railway, road, or canal whereby the amount of earth cut from cuttings roughly matches the amount of fill needed to make nearby embankments, so minimizing the amount of construction labor
6.Degree of Curve (D)- A measure of the curvature of a railway or highwayDriveway- a private road for vehicles, often connecting a house or garage with a public road
7.Egress- The act of coming or going out
8.Freeway- a major road that can be used without paying a toll
9.Ingress- Entrance onto the roadway
10.Sight Distance - The distance from which an object at eye level remains visible to an observer.
11.Station- a place along a route or line at which a bus, train, etc., stops for fuel or to pick up or let off passengers or goods
12.Tangent Line- A line sharing a common point with a curve or surface and being the closest linear approximation of the curve or surface at that point.
13.Transit Line- a line providing public transit
14.Turning Points- a point at which there is a change in direction or motion
15. Feeder- a road, service, etc., that links secondary areas to the main traffic network
1.Arterial- Being a main road or channel with many branches
2.Bench Mark- A standard by which something can be measured or judged
3.Collectors- One that collects
4.Curb Cut- A small ramp built into the curb of a sidewalk to ease passage to the street, especially for bicyclists, pedestrians with baby carriages, and physically disabled people
5.Cut and Fill- process of constructing a railway, road, or canal whereby the amount of earth cut from cuttings roughly matches the amount of fill needed to make nearby embankments, so minimizing the amount of construction labor
6.Degree of Curve (D)- A measure of the curvature of a railway or highwayDriveway- a private road for vehicles, often connecting a house or garage with a public road
7.Egress- The act of coming or going out
8.Freeway- a major road that can be used without paying a toll
9.Ingress- Entrance onto the roadway
10.Sight Distance - The distance from which an object at eye level remains visible to an observer.
11.Station- a place along a route or line at which a bus, train, etc., stops for fuel or to pick up or let off passengers or goods
12.Tangent Line- A line sharing a common point with a curve or surface and being the closest linear approximation of the curve or surface at that point.
13.Transit Line- a line providing public transit
14.Turning Points- a point at which there is a change in direction or motion
15. Feeder- a road, service, etc., that links secondary areas to the main traffic network
Thursday, April 1, 2010
Vocab 3.1
Building Inspector-An authorised person who is responsible for checking buildings in the course of construction and completed buildings to ensure that they have been constructed in accordance with building control provisions.
Covenants-a signed written agreement between two or more parties (nations) to perform some action
Deed Restrictions-Clauses in a deed limiting the future uses of the property.
Infrastructure-the basic structure or features of a system or organization
Legal Descriptions-describe the location of your land in legal documents
Lot Size-the size of your property
Ownership-is the land, etc. that you own
P & Z Board-reviews and approves site plans for three units or more of residential development and all commercial development.
Regulations-an authoritative rule
Setback-is a problem that slows down the process of what your doing
Site- an area that has been chosen to have something built on it
Site Orientation-architect or designer take into consideration when beginning the design process.
Site Plan-architectural plan, and a detailed engineering drawing of proposed improvements to a given lot
Soil Perc Test-test measures the ability of the soil to absorb liquid.
Solar Orientation-
Sound Orientation-
Terrain-piece of ground having specific characteristics or military potential
Utilities- company that performs a public service
Viability Analysis-statistical analysis that provides an estimate of the probability
View Orientation-
Wetlands-area of land whose soil is saturated with moisture either permanently or seasonally.
Wind Orientation-
Zoning-dividing an area into zones or sections reserved for different purposes such as residence and business and manufacturing
Building Inspector-An authorised person who is responsible for checking buildings in the course of construction and completed buildings to ensure that they have been constructed in accordance with building control provisions.
Covenants-a signed written agreement between two or more parties (nations) to perform some action
Deed Restrictions-Clauses in a deed limiting the future uses of the property.
Infrastructure-the basic structure or features of a system or organization
Legal Descriptions-describe the location of your land in legal documents
Lot Size-the size of your property
Ownership-is the land, etc. that you own
P & Z Board-reviews and approves site plans for three units or more of residential development and all commercial development.
Regulations-an authoritative rule
Setback-is a problem that slows down the process of what your doing
Site- an area that has been chosen to have something built on it
Site Orientation-architect or designer take into consideration when beginning the design process.
Site Plan-architectural plan, and a detailed engineering drawing of proposed improvements to a given lot
Soil Perc Test-test measures the ability of the soil to absorb liquid.
Solar Orientation-
Sound Orientation-
Terrain-piece of ground having specific characteristics or military potential
Utilities- company that performs a public service
Viability Analysis-statistical analysis that provides an estimate of the probability
View Orientation-
Wetlands-area of land whose soil is saturated with moisture either permanently or seasonally.
Wind Orientation-
Zoning-dividing an area into zones or sections reserved for different purposes such as residence and business and manufacturing
3.2 Questions
1. As the developer of a piece of property, what are the factors you need to consider for cost effectiveness and success in your development?
right materials you need, and you need to know what kind of soil you rbuilding on, like area levels, etc.
2. How are the selection of a site and the project being planned for the site inter-related?
Helps with making the plans.
3. What criteria or constraints, imposed on your site, can be changed and how would this influence your decision about the development of the property?
the soil, that is on the property that someone would like to build on, cause it could be unstable, witch would make it harder to build on. it would take more work so it would be easiar to go some where else.
4. Who are the current and past owners of the property?
William Coty
5. Are there any buried lines, tanks, etc. you need to worry about for the project?
No theres nothing
1. As the developer of a piece of property, what are the factors you need to consider for cost effectiveness and success in your development?
right materials you need, and you need to know what kind of soil you rbuilding on, like area levels, etc.
2. How are the selection of a site and the project being planned for the site inter-related?
Helps with making the plans.
3. What criteria or constraints, imposed on your site, can be changed and how would this influence your decision about the development of the property?
the soil, that is on the property that someone would like to build on, cause it could be unstable, witch would make it harder to build on. it would take more work so it would be easiar to go some where else.
4. Who are the current and past owners of the property?
William Coty
5. Are there any buried lines, tanks, etc. you need to worry about for the project?
No theres nothing
Subscribe to:
Posts (Atom)

